news

Cooling water piping replacement for unit no. 1 to 8 of Ta-Shan Diesel Power / Taiwan Power Co.

Cooling water piping replacement for unit no. 1 to 8 of Ta-Shan Diesel Power / Taiwan Power Co.

2017金門塔山電廠海水系統管路汰換及增設工程.工廠預製管件,運送至現場安裝.

Fuel and water supply system retrofitted for DEDEDO Power of GPA / GUAM

Fuel and water supply system retrofitted for DEDEDO Power of GPA / GUAM

2017關島DEDEDO電廠BOP管線更新

2017 Pre-Operation Boiler Chemical Cleaning ( Ta -Lin Power unit no.1 / 800 MW )

2017 Pre-Operation Boiler Chemical Cleaning ( Ta -Lin Power unit no.1 / 800 MW )

2017Pre-OperationBoilerChemicalCleaning(

2017 Fuel Additive for heavy oil burned boiler

2017 Fuel Additive for heavy oil burned boiler

將UFT528有機鎂添加劑50噸出貨供應台電協和發電廠燃油鍋爐使用